Southern Railway’s Birmingham Special at Riverton Junction in Front Royal, Virginia

Front Royal to Broadway, Virginia

Manassas Gap
Railroad

A rail-with-trail proposal for the Shenandoah Valley that preserves the corridor for potential short-line freight, scenic excursions, and a public walking and biking trail.

Riverton Junction, Front Royal, VA · 1969 · Roger Puta
48.5 milesHistoric rail corridor
Front Royal to BroadwayNorthern Shenandoah Valley
Rail with trailProposed configuration

Rails with Trails

See how a public trail, scenic train rides, and short-line freight could share the historic corridor from Front Royal to Broadway.

Explore the proposal

The Corridor

A transportation corridor through the Valley

The existing right-of-way runs through Warren, Shenandoah, and Rockingham counties. Retaining the rail alignment preserves the option to connect Valley producers and industrial sites to the broader freight network. A separately designed trail could connect residents and visitors to towns, local businesses, and historic sites.

View VDOT’s corridor assessment and map

Freight & Industrial Development

Another shipping option for Valley businesses

A restored short line could give local shippers access to rail for part of a trip. The commercial case would depend on shipper demand, actual freight volumes, interchange arrangements, and the cost of restoring the line.

Buckingham Branch locomotive switching freight cars beside grain-handling equipment at the Augusta Co-op
Buckingham Branch Railroad at Augusta Co-op · Staunton, Virginia. Nathan Simmons · CC BY-SA 3.0.

Agriculture

Farms, cooperatives, and agricultural suppliers could evaluate rail for bulk inputs and products such as fertilizer, feed, and grain.

Industrial access

Manufacturers and distributors could assess whether direct rail access or a nearby transfer facility would fit their supply chains.

Truck-to-rail transfer

A transload site could allow shippers without their own sidings to combine local trucking with longer-distance rail service.

Rail with Trail

Rail operations and recreation in one corridor

The proposal would retain the rail alignment and provide an adjacent, separately designed public trail. The final alignment, setbacks, road crossings, and bridge treatments would depend on engineering and approvals.

A paved multiuse path and railroad tracks diverge around a grassy strip near Frostburg
Great Allegheny Passage · Near Frostburg, Maryland. daveynin · CC BY 2.0 · Display cropped.

Scenic excursions

Future excursion operators could build itineraries around Valley scenery, historic interpretation, and stops near local shops, restaurants, and lodging.

Walking and biking

A multiuse trail could connect downtowns and historic sites and create opportunities for outfitters and other visitor-serving businesses.

Rail and trail design

Engineered separation and crossings would support a public trail while retaining space to evaluate future freight and excursion operations.

Railroad Heritage

Built to connect Valley agriculture to wider markets

Chartered in 1849, the Manassas Gap Railroad reached Strasburg in 1854. It linked the agricultural Shenandoah Valley to northern Virginia and connected with the Orange and Alexandria Railroad at Manassas Junction.

During the Civil War, that same connection became strategically important. The surviving alignment ties together farms, towns, and battlefield landscapes and gives future visitors a way to understand how the railroad shaped the Valley’s economy and geography.

Explore the historic railroad map at the Library of Congress

Nineteenth-century illustration of Manassas Junction
Manassas Junction. Library of Congress, Prints & Photographs Division.

Project Status

Restoring rail service and adding a trail

We’re working to restore service on this historic short line and add a pedestrian trail alongside the tracks.

VDOT completed its rail-with-trail assessment in 2026 and reports that Virginia directed acquisition negotiations. The trail configuration remains undecided. Restoring rail service would require control of the corridor, rehabilitation, funding, an operator, and applicable approvals.

The federal abandonment proceeding is listed as postponed in the Surface Transportation Board’s case status. See docket AB 290 (Sub-No. 425X).